
PROJECT GALLERY
Current & Past Projects



Rural vehicle crossing built to ATCOP standards
Retaining Wall
ECI contract which included a large timber pole retaining wall using Blade Piles as tie-back anchors to remediate flood related slip in Kaukapakapa
Structural Concrete Works
Another complex hydroslide footing for Auckland Council at Mt Albert Leisure Centre



Insitu concrete stairs in a new subdivision
Land Recontouring
Reshaping of land after a large landslip
Subdivision
Newly completed subdivision in Auckland with street furniture installed



Commercial Blade Pile site in Flat Bush. Scope of works included the installation of 58 blade piles
Subdivision Works
64 lot subdivision in Hobsonville, scope of works included all driveways, footpaths, permeable paving, rain gardens and kerbs
Residential House Foundation
Residential concrete foundation/slab in Auckland



Insitu concrete stairs in a new subdivision
Tactile Pavers
Installation of pedestrian tactile pavers
Subdivision
Newly completed subdivision in Auckland with street furniture installed



Residential House Foundation
251m2 4kg black oxide suspended concrete foundation slab in Warkworth, ready for exposed concrete polish finish
Structural Concrete Works
Demolition of existing hydroslide. Construction of new concrete hydroslide footing including blade pile installation
Landscape Retaining Wall
Extensive landscape retaining to create a flat pad for an above-ground pool



Screw Piling
Installation of 56 screw piles in preparation for suspended concrete slab construction
Rural Accessway
Construction of a concrete rural right of way in a new subdivision in Puhoi, constructed to ATCOP and Council standards
Retaining Wall
Under construction - 2.0m high, 50.0m long, retaining wall with lagging face-fixed for aesthetics



Slip Repair
Installation of emergency temporary slip protection, to protect the slip from further adverse weather
Concrete Works
Construction of concrete kerbs, paving and footpaths in a new subdivision
Concrete Works
Construction of new footpath and installation of safety tactiles, compliant with RTS 14 and Auckland Transport standards



Drainage
Installation and connection of one of several rain gardens in a new subdivision
Permeable Paving
Preparation and installation of permeable paving in a new subdivision
Demolition
Demolition of concrete driveway taking care to protect existing structures and services